
Sector 05
Industrial, Warehousing & Cold Chain
Portal frames, clear-span stores, insulated cold rooms and the yards that serve them.
A clear span is only useful if the floor takes the load, the doors suit the vehicle and the envelope holds the temperature. We build steel-framed stores, insulated panel cold rooms and chilled stores, hardstanding and loading canopies, and we erected a prefabricated engineering camp for the AKK gas pipeline project.
- Structures
- Portal frames · clear-span stores
- Cold chain
- Insulated panel cold rooms
- Camp
- Prefabricated camp, AKK project
Photographs (20)
From the register
| No. | Client | Engagement | Role | Status |
|---|---|---|---|---|
| 12 | Wiz Engineering | Prefabricated engineering camp erection for the AKK oil and gas project | Sub-contractor | Completed |
Next step
Tell us about your project.
Answer a few questions and send them to us on WhatsApp or email. You get a reference number straight away.