Reclamation platform and access embankment advancing across low-lying wetland, Lagos

Sector 03

Drainage, Erosion Control & Reclamation

Channelisation, gabion revetment and land reclamation: building ground where there was water.

Our erosion control work began on the Osogbo–Ikeja high-voltage transmission line network and now extends to channelisation and reclamation schemes in Lagos.

The methods are conventional (dredge, line, protect, fill, compact); the sequencing is what matters. Gabions are prepared ahead of the working front, geotextile goes down before the hydrology changes, and fill is placed and compacted in layers that can be tested.

Transmission corridor
Erosion control, Osogbo–Ikeja HV lines
Lagos
Channel and reclamation works
Systems
Gabion · stone pitching · geotextile

Photographs (19)

From the register

No.ClientEngagementRoleStatus
11West Transmission Line NetworkErosion control for HV transmission lines, Osogbo–IkejaSub-contractorCompleted